|
|
Close inspection of the photographs may detect some Steel Tec , Gilbert Erector and even Marklin parts being used. I am not a purist. |
Site by David
Lawrence |
|
Stage 3 |
![]() |
![]()
ALTERATION SINCE STAGE 2 Awaited parts (Threaded Couplings) are now to hand and both motorized legs are now operational.
|
![]() |
This photograph shows Centre of gravity platform moved to the opposite end of its travel. Note: The #52 Flanged Plate is now at the far end of the main frame.
NEXT MOVE With dummy weight on the C of G platform carry out first test with wired power to determine if walking movement achieves forward movement. |
![]() |
This photograph shows a close-up of the new Centre of gravity shift drive. A gear motor belt driven to a 1.1/2"pulley shaft fixed to a Triple Eccentric (3/4" throw) attached to the same threaded rod (for position adjustment) now applied to the forth hole above the pivot.
TEST: |
|
|
This lower photograph shows the remote control gear being prepared for installation. This gear was obtained from a #9515 Moon Trekkers set which only had one motor. The hand set and the control box appears to be capable of handling two motors. This will mean obtaining similar plugs for a second motor. I have an almost similar plug and socket from Radio Shack but I have to remove some plastic to make it fit.
|
|
Site maintained by Dolphin Design and hosted by www.kzwp.com |